The Ijora LNG Project

The Ijora LNG Project is Nigeria’s 1st fully contained in-land liquefied natural gas (LNG) storage facility with a 30,000CuM capacity. With construction already underway, the terminal is scheduled for completion and operation within 2 years.

The shipping infrastructure includes a direct connection to the NPSC jetties through a 12-inch double-walled LNG pipeline to receive gas. The LNG terminal is designed to NFPA 59 standards.